Floating detention centre construction

Floating detention centre construction

C008/5450 Rights Managed

Request low-res file

530 pixels on longest edge, unwatermarked

Request/Download high-res file

Uncompressed file size: 50.7MB

Downloadable file size: 3.6MB

Price image Pricing

Please login to use the price calculator


Credit: CHRISTOPHE VANDER EECKEN/REPORTERS/SCIENCE PHOTO LIBRARY

Caption: Floating detention centre construction. Barge transporting a finished concrete pontoon from Ghent in Belgium to Zaandam in the Netherlands. This pontoon is one of two floating platforms that will be used in the construction of a floating detention centre, which will be moored off Zaandam. The trip form Ghent to Zaandam will take 4 days. Photographed in Zelzate, Belgium in November 2005.

Release details: Model release not required. Property release not required.

Keywords: 08 november, 08/11/2005, 2005, 21st century, 8th, barge, base, belgian, belgium, boats, canal, cargo, cargo barge, coal, concrete, construction, detention boat, detentionboats, dutch, europe, european, floating detention centre, floating prison, fossil fuel, fuel, german, industrial, industry, moving, platform, pontoon, prison, transport, transportation, transporting, tug, vehicle, vessel, water, waterway, zelzate

Licence fees: A licence fee will be charged for any media (low or high resolution) used in your project.