Thames flood barrier

Thames flood barrier

E160/0069 Rights Managed

Request low-res file

530 pixels on longest edge, unwatermarked

Request/Download high-res file

Uncompressed file size: 24.3MB

Downloadable file size: 1.8MB

Price image Pricing

Please login to use the price calculator


Credit: BEN JOHNSON/SCIENCE PHOTO LIBRARY.

Caption: The metal-clad cupolas and yellow-painted lifting gear of the Thames Flood Barrier, Woolwich, London. Officially opened in 1984, the project took 8 years to complete and cost nearly #500 million. The barrier consists of 10 moveable D- shaped gates supported by 9 concrete piers, each containing the hydraulic machinery which lifts the gates into position. When not in use the gates rest in concrete sills on the bed of the river, causing no hindrance to river traffic.

Release details: Model release not required. Property release not required.

Keywords: barrier, climate, control, england, flood, flooding, london, meteorology, protection, thames flood barrier, uk, united kingdom, weather

Licence fees: A licence fee will be charged for any media (low or high resolution) used in your project.