Normandy Bridge under construction

Normandy Bridge under construction

T840/0241

Rights Managed

Caption

Normandy Bridge under construction. A daytime view of the Normandy Bridge during construction, showing a completed 'A-shaped' tower with a partially built span projecting out over the River Seine estuary. The bridge design consists of two viaducts (one seen at lower left behind the tower) connected by a central span which is supported by a cable stay system (anchored cables bear the weight of the central span). It will have a total length of 2141 metres (central span 856 metres). This double-towered road bridge is planned to be completed in 1995 in order to relieve congestion on the routes to western France.

Release details

Model release not required. Property release not required.

 {{ i.shot_duration ? i.shot_duration + ' ' : '' }}{{ i.shot_uhd ? '4K ' : i.hires ? 'HD ' : '' }}{{ i.spl_number }} R{{ i.license }}

  • Add to board
  • Similar {{ mediaType(i) }}