Engineer setting up turbo-visory equipment

Engineer setting up turbo-visory equipment

T840/0447 Rights Managed

Request low-res file

530 pixels on longest edge, unwatermarked

Request/Download high-res file

Uncompressed file size: 55.5MB

Downloadable file size: 5.0MB

Price image Pricing

Please login to use the price calculator


Credit: PETER BOWATER/SCIENCE PHOTO LIBRARY

Caption: Engineer setting up turbo-visory equipment to check rotation of turbine shaft during turbine installation in new coal fired power station in Hong Kong, China.

Release details: Model release not available. Property release not required.

Keywords: asia, asian, assembling, assembly, china, chinese, electricity, electricity generation, electricity supply, energy, engineer, engineering, engineers, hong kong, industries, industry, machine, machinery, machines, man, manufacturing, mechanical engineering, men, power, power plant, power plants, power station, power stations, rotary, rotor, rotors, shaft, spindle, technician, technicians, turbin, turbine, turbine blade, turbine blades, turbines, turbo visory, xianggang

Licence fees: A licence fee will be charged for any media (low or high resolution) used in your project.