The Walney Offshore Wind farm

The Walney Offshore Wind farm

C026/4410 Rights Managed

Request low-res file

530 pixels on longest edge, unwatermarked

Request/Download high-res file

Uncompressed file size: 60.2MB

Downloadable file size: 3.5MB

Price image Pricing

Please login to use the price calculator


Credit: ASHLEY COOPER/SCIENCE PHOTO LIBRARY

Restrictions: Editorial Use Only

Caption: The Walney Offshore Wind farm project is located 15km off Barrow in Furness in Cumbria, UK. The project consists of Walney 1 and Walney 2 each with 51 turbines. It has 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the Walney site.

Release details: Model release not available. Property release not required.

Keywords: clean energy, climate change, coast, cone, construction, dock, dong energy, electricity, energy, energy company, engineer, global warming, green energy, man, mostyn renewable energy, north wales, nose cone, offshore, offshore wind farm, port, power, power company, ppe, siemens, steel, technology, turbine, wales, walney, wind, wind farm, wind power, wind turbine

Licence fees: A licence fee will be charged for any media (low or high resolution) used in your project.