PPE instruction

PPE instruction

C026/4441 Rights Managed

Request low-res file

530 pixels on longest edge, unwatermarked

Request/Download high-res file

Uncompressed file size: 50.0MB

Downloadable file size: 1.8MB

Price image Pricing

Please login to use the price calculator


Credit: ASHLEY COOPER/SCIENCE PHOTO LIBRARY

Restrictions: Editorial Use Only

Caption: PPE instruction signs and an engineer inside a siemens offshore wind turbine destined for the Walney offshore wind farm.

Release details: Model release not available. Property release not required.

Keywords: clean energy, climate change, coast, construction, dock, dong energy, electricity, energy, energy company, engineer, global warming, green energy, hard hat, health and safety, high vis, instructions, mostyn renewable energy, north wales, offshore, offshore wind farm, port, power, power company, ppe, risk assessment, siemens, sign, steel, technology, turbine, wales, walney, wind, wind farm, wind power, wind turbine

Licence fees: A licence fee will be charged for any media (low or high resolution) used in your project.