Parts for the Walney offshore wind farm

Parts for the Walney offshore wind farm

C028/9253 Rights Managed

Request low-res file

530 pixels on longest edge, unwatermarked

Request/Download high-res file

Uncompressed file size: 60.2MB

Downloadable file size: 4.7MB

Price image Pricing

Please login to use the price calculator


Credit: ASHLEY COOPER/SCIENCE PHOTO LIBRARY

Restrictions: Editorial use only

Caption: Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows workmen controlling the lifting of a nacelle.

Release details: Model release not available. Property release not available.

Keywords: coast, colleague, construction, control, crane, docks, dong, electricity, energy, hard hat, health and safety, helmet, high tide, high vis, hoist, jack up barge, lift, lifting, line attachment, low loader, male, man, mostyn, nacelle, north wales, offshore, orange, port, power, ppe, push, renewable, renewable energy, renewable power, siemens, trailer, turbine, vest, wales, weight, wharf, wind, wind energy, wind farm, wind power, wind turbine, work mate

Licence fees: A licence fee will be charged for any media (low or high resolution) used in your project.