Parts for the Walney offshore wind farm

Parts for the Walney offshore wind farm

C028/9260 Rights Managed

Request low-res file

530 pixels on longest edge, unwatermarked

Request/Download high-res file

Uncompressed file size: 60.2MB

Downloadable file size: 4.1MB

Price image Pricing

Please login to use the price calculator


Credit: ASHLEY COOPER/SCIENCE PHOTO LIBRARY

Restrictions: Editorial use only

Caption: Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the jack up barge and turbine pieces.

Release details: Model release not required. Property release not available.

Keywords: coast, construction, docks, dong, electricity, energy, jack up barge, mostyn, north wales, offshore, port, power, renewable, renewable energy, renewable power, siemens, turbine, wales, wharf, wind, wind energy, wind farm, wind power, wind turbine

Licence fees: A licence fee will be charged for any media (low or high resolution) used in your project.