The jack up barge, Kraken

The jack up barge, Kraken

C028/9313

Rights Managed

Restrictions:

Editorial use only.

Caption

The jack up barge, Kraken, loaded with wind turbines for the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, lifts a tower piece into place. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.

Release details

Model release not available. Property release not available.

 {{ i.shot_duration ? i.shot_duration + ' ' : '' }}{{ i.shot_uhd ? '4K ' : i.hires ? 'HD ' : '' }}{{ i.spl_number }} R{{ i.license }}

  • Add to board
  • Similar {{ mediaType(i) }}