A tug boat towing a jack up barge

A tug boat towing a jack up barge

C028/9324 Rights Managed

Request low-res file

530 pixels on longest edge, unwatermarked

Request/Download high-res file

Uncompressed file size: 50.0MB

Downloadable file size: 4.1MB

Price image Pricing

Please login to use the price calculator


Credit: ASHLEY COOPER/SCIENCE PHOTO LIBRARY

Restrictions: Editorial use only

Caption: A tug boat tows the jack up barge the Goliath towards the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK, at sunset. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.

Release details: Model release not required. Property release not available.

Keywords: barrow in furness, blade, carbon neutral, coast, colour, colourful, construction, construction industry, cumbria, environment, green, green employment, green investment, green job, heavy industry, industry, off shore, offshore, offshore wind farm, renewable, renewable energy, rotor blade turbine blade, steel, tow, towing, towing wire, tug, tug boat, turbine, uk, walney, walney offshore wind farm, wind farm, wind power, wind turbine, wire

Licence fees: A licence fee will be charged for any media (low or high resolution) used in your project.