Executive climbs a wind turbine

Executive climbs a wind turbine

C028/9361 Rights Managed

Request low-res file

530 pixels on longest edge, unwatermarked

Request/Download high-res file

Uncompressed file size: 60.2MB

Downloadable file size: 4.4MB

Price image Pricing

Please login to use the price calculator


Credit: ASHLEY COOPER/SCIENCE PHOTO LIBRARY

Restrictions: Editorial use only

Caption: A health and safety executive reads a turbine instruction manual at the Walney offshore wind farm, it consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy, Cumbria, UK.

Release details: Model release not available. Property release not available.

Keywords: barrow in furness, carbon neutral, climbing harness, coast, colour, colourful, confined space, construction, construction industry, crew, cumbria, drop, environment, green, green employment, green investment, green job, harness, health and safety, heavy industry, helmet, high vis, industry, inside, instruction manual, internal, ladder, ladder climbing, manual, off shore, offshore, offshore wind farm, ppe, protection, rad, reading, renewable, renewable energy, rotor blade, steel, transition piece, turbine, uk, walney, walney offshore wind farm, wind farm, wind power, wind turbine, worker, working at height, yellow

Licence fees: A licence fee will be charged for any media (low or high resolution) used in your project.